Two weeks break for the workers team and various holidays but the house is now finally closed. Window team installed the skylight and the missing windows on the ground floor and 3rd floor balcony door.
Month: June 2017
Day 394 – 16/06
Day 389 – 11/06
Day 382 – 04/06
Day 381 – 03/06
Quick night test for the lights. Everything works great and the energy saving LEDs have an amazingly low power consumption.