Day 279 – 21/02

Again a slow week of work as the old generator was not strong enough for the welding machine. Took a bit of time but the new generator from the contractor arrived and the build of the steel-wood staircases is now going ahead.

Day 272 – 14/02

Workers fixed little mistakes here and there, plastering the last bits as well as connecting the pipes between the different floors. Some pipes have been put into place quite randomly so we had to correct position & slope etc. – not so easy but now all at the right place. Waterproof liquid has been used to treat the flat roof for the upcoming cement topping.