Ground floor slab is done. Now a bamboo-steel frame is put up for the work on the second floor. Also lots of steel bending work ahead for the side beams of the second floor.
Month: July 2016
Day 66 – 23/07
Day 58 – 15/07
Day 54 – 11/07
Ground floor columns done and drying…
Up next: first pipe installations for the plumbing system.